kNm Hydraulikk as
Norwegian (Bokmål) 
udersider-banner_n

NEWS & EVENTS

Oseberg Shut Down

Oseberg Shut Down

kNm Hydraulikk partnered up with Equinor for the Oseberg shutdown in 2011.

 
Green Energy

Green Energy

Accurate bolt tension requires knowledge. 

 
Lista Wind Turbine Park

Lista Wind Turbine Park

Installation and maintenance of foundation bolts. 
Gaselle 2012

Gaselle 2012

kNm Hydraulikk named Gaselle 2012
ISO Certified

ISO Certified

kNm Hydraulikk certified and approved in accordance with NS-EN ISO 9001:2008
ONS 2012

ONS 2012

kNm Hydraulikk wil be represented at ONS in Stavanger from the 28th to the 31th of August. 
 
Wind Farm - Lista

Wind Farm - Lista

kNm Hydraulikk awarded the prestigious contract with Veidekke.
kNm Safety Nut

kNm Safety Nut

kNm Hydraulikk launches the kNm Safety Nut.
NS-EN 1591-4 Flange Work Course

NS-EN 1591-4 Flange Work Course

kNm Hydraulikk have been approved to hold NS-EN 1591-4 courses. 
n%C3%B8yaktighet

Nøyaktighet

Nøyaktig forspenning av boltede forbindelser er ingen selvfølge. Våre produkter har patenterte løsninger som kombinerer hastighet og nøyaktighet.
kvalitet

Kvalitet

Kvalitet er vårt varemerke og våre kunder er de beste referanser. 
kNm Hydraulikk stiller høye krav til sine underleverandører og deres produkter. Utstyret er produsert i USA, Sverige og Tyskland.