Lista Wind Turbine Park

Installation and maintenance of foundation bolts. 

Lista Wind Turbine Park
In 2013, kNm Hydraulikk was awared the contract for the installation of 31 wind turbine foundations in Lista Wind Turbine Park. 

Groundwork on the park was conducted by Veidekke and the installation of the foundations were carried out by employees from kNm Hydraulikk. The turbines were supplied by Siemens. 


 
Green Energy

Green Energy

Accurate bolt tension requires knowledge. 

 
Green Energy
Gaselle 2012

Gaselle 2012

kNm Hydraulikk named Gaselle 2012
Gaselle 2012
ISO Certified

ISO Certified

kNm Hydraulikk certified and approved in accordance with NS-EN ISO 9001:2008
ISO Certified
ONS 2012

ONS 2012

kNm Hydraulikk wil be represented at ONS in Stavanger from the 28th to the 31th of August. 
 
ONS 2012